Skip to main content
Municipal solid waste sorting plant with conveyors and recovery equipment

Industry

MSW Sorting, RDF & Municipal Waste Plants

We design MSW processing and RDF plants around actual moisture, contamination and material composition rather than catalogue assumptions. Project scope and delivery responsibilities are defined with each urban local body or EPC partner.

Challenges

What we hear from operators

  • High moisture and putrescible fraction
  • Mixed dry & wet waste at intake
  • Land and footprint constraints
  • Reliable RDF calorific value for cement kilns

Outcomes

What you can expect

  • More consistent recovered and RDF fractions
  • Reduced material sent directly to landfill
  • Footprint planning for constrained urban sites

Our solutions

Lines we engineer for this sector

Intake & primary sorting

Bag openers, trommels and ballistic separators for fast volume reduction.

RDF production

Secondary shredding and air classification to consistent cement-kiln spec.

Dry-waste recovery

Material recovery facility (MRF) for PET, HDPE, paper, metal, glass.

Wet-waste line

Organic shredding and dewatering for compost or biogas feed.

Typical equipment

What goes into the line

Bag openers Trommel screens Ballistic separators Overband magnets Eddy current separators Single & secondary shredders Baling presses

FAQ

Municipal Solid Waste — questions answered

Planning a municipal solid waste project?

Share the feedstock, throughput and site conditions for an application-specific review.